Free Gantt Chart Maker

Plan and communicate a project schedule with task bars on a calendar axis. Add progress percentages, one-day milestones and phases, then export a clean chart for your plan or slide deck.

Website Redesign PlanGantt chart with 7 tasks from Jan 5, 2026 to Mar 23, 2026.Website Redesign PlanQ1 2026PlanningDesignBuildLaunchJan 11Jan 25Feb 8Feb 22Mar 8Mar 22Requirements100%UX design80%Design sign-offFeb 2, 2026Frontend build45%Backend build60%Testing10%LaunchMar 23, 2026
View chart data as a table

Gantt chart with 7 tasks from Jan 5, 2026 to Mar 23, 2026.

Tasks (end dates inclusive)
TaskStartEndDaysProgressPhase
Requirements2026-01-052026-01-1612100%Planning
UX design2026-01-122026-01-301980%Design
Design sign-off2026-02-022026-02-021—Design
Frontend build2026-02-022026-03-063345%Build
Backend build2026-01-262026-02-273360%Build
Testing2026-03-022026-03-201910%Launch
Launch2026-03-232026-03-231—Launch

Download your chart

PNG, JPEG, SVG and PDF downloads are created in your browser once the editor loads.

How to make a gantt chart

  1. Enter each task with a start date and end date. YYYY-MM-DD is safest, but formats like “Mar 3 2026” also work.
  2. Optionally add progress (0–100%) and a phase or owner to color the bars.
  3. For a milestone, make the start and end the same date and leave Progress blank.
  4. In Customize → Chart options, sort tasks, choose the text shown on bars, and add a marker line for today or a deadline.
  5. Download as PNG, SVG or PDF. Use a wide aspect ratio for long projects.

Data format

ColumnTypeNotes
TaskTextRequired
Start dateDateRequired
End dateDateRequired
Progress %Number (zero or positive) (max 100)Optional
Phase / owner (optional)TextOptional

Up to 200 rows. One row per task. Dates are calendar days (YYYY-MM-DD is safest); the end date is inclusive, so a task from Mar 3 to Mar 3 lasts one day. Make start and end the same and leave Progress blank for a one-day milestone. Phase / owner colors the bars.

Customization options

  • Progress fill inside each bar.
  • Milestones drawn as diamonds.
  • Phase colors with a legend.
  • Bar text: progress, duration in days, or dates.
  • Marker line for any date (today, a deadline or a review).
  • Automatic date axis that switches between days, weeks, months, quarters and years as needed.

Downloading and exporting

  • PNG: best for slides, documents and the web. It supports transparent backgrounds, and you can choose standard, 2×, 4× or slide-sized (1920 × 1080) output.
  • JPEG: a smaller file with a solid background.
  • SVG: a true vector file. It stays sharp at any size and can be edited in Illustrator, Inkscape or Figma.
  • PDF: vector PDF sized to the chart, A4 or US Letter. If your labels use characters outside the standard PDF fonts (for example Chinese, Arabic or emoji), the PDF uses a high-resolution image instead and tells you.
  • CSV and .json: your data, or the whole chart with its settings, to re-open later.

When to use a gantt chart

  • Project plans with tasks that overlap or depend on each other in time.
  • Status updates showing what is done, in progress and upcoming.
  • Event or campaign schedules.

When to choose a different chart

  • You are listing historical events. A timeline is more readable.
  • You need to manage dependencies, resources or critical paths. Use dedicated project-management software; this tool is for communicating a plan visually.

Common mistakes to avoid

Ambiguous dates

Is 03/04/2026 March 4th or April 3rd? Use YYYY-MM-DD to avoid ambiguity. Slash dates are read as month/day unless the day is greater than 12.

End before start

Tasks whose end date is earlier than their start date are rejected with an error rather than drawn backwards.

Too much detail

Gantt charts for presentations work best with 5–20 tasks. Summarise sub-tasks into phases.

Practical examples

Website redesign

Requirements, design, frontend and backend builds, testing and launch, with design sign-off and launch as milestones.

Event planning

Venue booking, speaker confirmations, marketing waves and the event day itself.

Course schedule

Weekly modules with assignment deadlines as milestones.

How dates and durations work

Dates are treated as calendar days in UTC, so your chart never shifts by a day because of your time zone. End dates are inclusive: a task from Jan 5 to Jan 16 lasts 12 days and its bar covers the whole of Jan 16. Durations count calendar days, not working days.

Frequently asked questions

Is this Gantt chart maker free?

Yes. It is completely free, with no account and no watermark.

How do I add a milestone?

Use the same date for start and end and leave Progress blank. It is drawn as a diamond.

Can I import tasks from Excel?

Yes. Import an .xlsx or CSV file with columns Task, Start date, End date, Progress, Phase. Excel date cells are converted automatically.

Does it support task dependencies?

Not as arrows. Order tasks logically, and use phases and the marker line to communicate sequence.

Can I show today’s date?

Type today’s date in YYYY-MM-DD format into “Marker line date”.

Your data stays private

Charts are drawn by your browser. Your data isn’t uploaded to our servers; it is kept only in this browser’s storage, for autosave and saved charts, until you clear it. See our privacy policy.